hi-reach hi-reach
 
hi-reach
hi-reach
 
Hi-reach
 
hi-reach
Products
hi-reach Scaffoldings
hi-reach Beam Clamps
hi-reach Column Clamps
hi-reach Slab Decking
hi-reach Wall Formwork
hi-reach Mobile Towers
hi-reach Road Forms
hi-reach Access Straircase
hi-reach Accessories
hi-reach Certification
   
hi-reach
Cuplock Scaffolding
 
hi-reach
hi-reach
 
BRACING & TYING-IN

DIAGONAL FACE BRACING


All scaffolds require a certain amount of diagonal bracing to eliminate any tendency for the scaffold to distort or sway. For a scaffold more than 10 meters (4 Bays of 2.5 m) long, a minimum of 2 bays should be face braced. Bracing of the end bays should be avoided if possible. Face bracing is required over a full height for one bay in every four.

hi-reach
TYING-IN

Every scaffold must be tied to the permanent structure members used for connecting of scaffold to a building are called 'ties'. Ties can be taken through window openings or clamped to columns. Where these openings are not available than anchor fasteners are used.

Level of tying = 3 to 4 times width of scaffold (tying should be done in staggered arrangement)

 
Hi-reach
 
Contact Us
Hi-Reach House, D-147, Okhla Industrial Area,
Phase-1, New Delhi-110020, India

Phone : +91 11 46619100/41708975/76
Fax     : +91 11 26371085/46619120
Email   : sales@hireach.co.in
             mail.hireach@gmail.com